Tests on concrete
The Slump Test
Materials and tools
- A sample of freshly mixed concrete (about half
a wheelbarrow full)
- A wheelbarrow and shovel
- A flat steel plate about 600 x 600 mm by 3 mm
thick
- A metric rule or tape measure
- A scoop
- A steel tamping rod, 16 mm in diameter by 600
mm long that has at least one end rounded
- A standard slump mould (see Figure 1). The footplates
should be positioned 5 mm above the base of the cone.

How to measure the slump
- Mix the concrete in the wheelbarrow.
- Wipe all the tools with a damp cloth.
- Put the steel plate down on a level place so that
it is firm, and then put the slump mould on it with the narrow end at
the top. Stand on the footpieces.
- Fill the slump mould in three layers of about
equal depth. Tamp through each layer 25 times with the rounded end of
the tamping rod.
- The last layer should more than fill the mould.
After tamping the last layer, strike off the excess concrete, using
a sawing and rolling motion of the tamping rod, so
that the mould is completely filled and level.
- Hold the mould by the handles to keep it steady
while you step off the footpieces.
- Slowly lift the slump mould straight up and off
(see Figure 2).
- Turn the slump mould upside down and place it
on the plate, next to the concrete.
- Rest the tamping rod on top of the slump mould
so that one end is above the concrete.
- Carefully measure the distance between the bottom
of the tamping rod and the highest point of the concrete to the nearest
5 mm (see Figure 3).
- If you dont get a normal slump, repeat the
test. If the slump is still not normal, ask for advice.
How to make 150-mm cubes
Note Three cubes are needed for each test. If they
are to be tested at 7 days and at 28 days, you will need six cubes
three for each test.
Material and tools
- A sample of the concrete (about half a wheelbarrow
full)
- A wheelbarrow and a shovel
- A scoop
- Three standard moulds for each test
- A steel tamping rod, 600 mm long with a diameter
of 16 mm that has at least one end rounded
- A steel float
- Pieces of writing paper (absorbent paper) for
labels
- A ballpoint pen or, preferably, a soft pencil
- Mould release oil
- Grease
How to make the cubes
- Check that:
moulds are clean and do not have dust or dirt on them,
the joint faces have been greased,
they are assembled in the right way,
the bolts are tight.
- Smear release oil very thinly on the inside faces
of the moulds.
- Place the moulds on a firm, level surface.
- Mix the concrete well in the wheelbarrow.
- Fill the moulds with concrete in 50 mm layers.
- Tamp each layer at least 45 times with the rounded
end of the tamping rod to get the air bubbles out.
- The last layer should more than fill the mould.
After tamping the last layer, use the steel float to strike off the
surface of the concrete so that it is level with the top
of the mould.
- Write the following on a label for each cube:
the companys name,
the contract number or the reference number,
the date when the cube is made.
- Gently press the label onto the top of the cube.
- Cover the cube with damp sacking followed by a
sheet of plastic and store it in the shade, away from wind and where
it will not be disturbed.
- If the weather is cold, make and store the cubes
indoors.
The next day
- Loosen all the bolts on the mould.
- Gently loosen the sides of the mould and remove
them.
- It is a good idea to write the information on
the label on the cube with a lumber crayon.
- Put the cubes into water. The temperature of the
water should be 22°C25°C.
- Leave the cubes covered with water until they
are taken to the testing laboratory.
- Clean the moulds and assemble them again.
References
SANS 5860:1994 Concrete tests Dimensions, tolerances
and uses of cast test specimens
SANS 5861-2:1994 Concrete tests Sampling of freshly
mixed concrete
SANS 5861-3:1994 Concrete tests Making and curing
of test specimens
SANS 5862-1:1994 Consistence of freshly mixed concrete
Slump test
SANS 5863:1994 Concrete tests Compressive strength
of hardened concrete
Cement &
Concrete Institute
PO Box 168, Halfway House, 1685
Tel 011 315-0300 Fax 011 315-0584
e-mail info@cnci.org.za website
http://www.cnci.org.za
Published by the Cement & Concrete Institute, Midrand, 1997, reprinted
1999, 2001, 2006, 2007
©Cement & Concrete Institute
|